Plant Tour

Design

Every Excel RV begins in the Engineering and Design Department.

Cabinetry

Over in the Cabinet Department, drawers are assembled with plywood sides instead of the particleboard used by many manufacturers.

Sawing

In the Saw Department, raw materials are precision-cut to meet exacting specification.

Sidewalls

Sidewall components are assembled prior to entering the PPLS (Positive Pressure Lamination System) press.

Welding

We weld our own main frames in the Steel Fabrication Department.

Plumbing

Much of our plumbing and wiring is done prior to cabinet installation.

Slide-outs

In the slide-out assembly department, rooms are ready to be set on the fifth wheel unit.

Sidewalls wiring plumbing

After the slide-outs are set, wiring, plumbing, and flooring are in place and sidewalls are ready to be installed.

Insullation

Once the sidewalls and roof are fully assembled, overhead wiring is installed.

Framing

Excel takes great pride in the hidden details of our fifth wheels - like the high density insulation we install before putting on the fiberglass roof.

Vents

Vents are installed and seams are sealed after the roof is in place.

Window Treatments

The window treatments, bedroom ensembles, and upholstery are all manufactured at our plant.

Upholstery

We also manufacture our own sofas and bed mattresses in order to meet our exceptionally high standards of quality and workmanship.